Roadworks recently completed a project for Lane Construction at their Garner Asphalt Plant. The project consisted of excavation to embankment (cut to fill) of approximately 10,000 CY of earth material along with erosion and sedimentation control basins. An existing 30’ high earth berm was excavated down to allow haul traffic to pass through. A 900’ 12’ high berm around the site was created with the spoils from the excavation. Two large sediment basins were constructed to store and treat runoff.